I/O List (DCS / SIS-IPS / F&G) — Final Self-Verification Checklist

I/O List (DCS / SIS-IPS / F&G) — Final Self-Verification Checklist

Use this before the first formal review (internal/external). Applicable to DCS/BPCS, SIS/IPS/ESD, and Fire & Gas systems across EPC projects.
0 of 0 checked
Header & Document Control
Scope & Structure
Tagging, Channels & Cross-References
Hardware & Card Specification
Signal Conditioning, Barriers & Wiring
Scaling, Ranges & Units
Alarms, Trips & Digital States
Redundancy, Voting & Diagnostics
SOE, Time Sync & Timestamping
Interfaces, Networks & System Assignment
Power, Earthing & Cabinet Details
Testing, FAT/SAT & Commissioning
Data Integrity & Formatting
Notes, Attachments & Final Polish
Quick Sign-Off
Use this checklist before issuing the I/O List for first formal review.

Leave a Reply

Your email address will not be published. Required fields are marked *