Material Requisition (MR) – Comprehensive I&C Engineering Checklists for EPC Projects
Material Requisition (MR) — Final Self-Verification Checklist
Material Requisition (MR) — Final Self-Verification Checklist
Use this before the first formal review (internal/external). For tagged instruments (PT/TT/FT/LT, control/SD valves, MOVs), panels/JBs, analyzers, and bulk materials (tubing, fittings, glands, cables, accessories).
0 of 0 checked
Header & Document Control
Scope, Items & MR Strategy
Core Input Data Verification (The Cross-Check)
Technical Requirements & Specifications
Materials, Ratings & Environment
Painting, Coating & Corrosion Protection
Inspection, Testing & Certification
Vendor Documentation Requirements (VDR/SDRL)
Spares, Special Tools & Consumables
Packaging, Preservation, Marking & Shipping
Commercial & Delivery (Tech Stage Placeholders)
Compliance, Deviations & Alternatives
Data Integrity & Final Polish
Quick Sign-Off
Use this checklist before issuing the MR for first formal review or RFQ release.