C&PC Key Checks Quiz - 50 Questions

Commissioning & Pre-Commissioning Quiz - 50 Key Checks Before Energization

1. What is the primary purpose of an **Insulation Resistance Test (Megger Test)** before energization?

2. Which document *must* be issued before the Commissioning team can legally take control of the equipment?

3. What is the key pre-energization check for a transformer's oil level?

4. What is the main check performed during a **LOTO (Lockout/Tagout)** verification?

5. For a new motor installation, the final check before a *no-load run* is often the measurement of **Phase Sequence (Rotation)**. Why is this critical?

6. During a cable continuity check, what is the expected resistance value for a healthy conductor?

7. What is the primary check performed on a **protective relay** before functional testing?

8. When preparing a generator for its first synchronization, what key parameter must be closely matched to the grid?

9. What does the term **'Punch List A'** typically refer to in pre-commissioning documentation?

10. Before running a pump, the coupling alignment check is performed. What tool is most commonly used for a high-precision coupling check?

11. What is the purpose of conducting a **Pressure Test (Hydro Test)** on new piping systems?

12. Which device is used to check the **pick-up and drop-out voltage** of a contactor or solenoid?

13. In a protection system, the **ratio test** on a Current Transformer (CT) is used to verify what?

14. What is the crucial check to perform on **control valves** before introducing process fluid?

15. What is the primary safety check when opening the compartments of a live **switchgear**?

16. What does **SAT** stand for in the context of Commissioning & Pre-Commissioning?

17. Before a Variable Speed Drive (VSD) is energized, what must be confirmed regarding its cooling system?

18. What is the key pre-check for all **bolted electrical connections** in a busbar or panel?

19. In HVAC commissioning, what check confirms the **differential pressure switch** for a fan is functioning correctly?

20. What is the primary safety risk associated with an **open circuited CT secondary**?

21. Before the first fill of a closed-loop cooling system, what procedure is essential to remove construction debris?

22. What is verified by checking the **trip coil resistance** of a circuit breaker?

23. Before opening a pipe flange to install a spool piece, the line should be confirmed to be **de-inventoried**. What does this mean?

24. What is the essential pre-commissioning check for **cable glanding**?

25. What is a **Symptom Index (SI)** or **Test Case ID** primarily used for in Commissioning?

26. Before introducing steam to a pipe network, the system must be verified free of **non-condensable gases**. What is the most critical non-condensable gas to remove?

27. What is the fundamental difference between Pre-Commissioning (PC) and Commissioning (C)?

28. Which test confirms the integrity of the **earthing grid** and its connections before energization?

29. When performing a **loop check** on an instrument signal (e.g., pressure transmitter), what is the key check?

30. What is the main safety precaution when testing a **Safety Relief Valve (SRV)**?

31. Before closing a duct or vessel after internal inspection, what is the crucial check to prevent foreign objects from entering the stream?

32. The final check on a **DC battery system** before connecting the load is to verify what?

33. What is the required condition for a **fire alarm or gas detection loop** before functional testing?

34. A **HIPOT (High Potential) Test** is primarily used to check for faults in which part of an electrical system?

35. What is the essential pre-check for a **motor operated valve (MOV)** limit switch?

36. What is the primary purpose of a **Pre-Start Safety Review (PSSR)**?

37. Before energizing a control panel, what check ensures the correct separation of intrinsic safety (IS) circuits?

38. In a heat exchanger pre-commissioning, what test is performed to detect any cross-contamination between the shell and tube sides?

39. What is verified by a **Primary Current Injection Test** on a circuit breaker?

40. In a gas turbine pre-commissioning, which check ensures the fuel supply system is clean and ready for ignition?

41. What is the key focus of a pre-commissioning check for a **fire pump's pressure control loop**?

42. What document typically contains the detailed **step-by-step instructions and acceptance criteria** for a specific piece of equipment's testing?

43. Before the initial vacuum pull on a refrigeration system, what has to be verified to prevent moisture freezing and damaging the pump?

44. Why is a final **WIRING CHECK** against the schematic drawing the most time-consuming yet crucial electrical pre-energization task?

45. What is the final check before removing the **temporary strainers/filters** in a lube oil system?

46. Before energizing a motor starter, what must be confirmed about the thermal overload setting?

47. In DCS/PLC pre-commissioning, what test is performed to ensure the input/output modules are healthy and communicating?

48. What is the main pre-commissioning check for a new **air compressor**?

49. For underground cables, which test is recommended to detect small localized defects or voids in the insulation structure before energization?

50. The final, overarching pre-commissioning check before system handover is the approval of what document?

Quiz Results

Your Score: 0 / 50

Review your answers below. Correct answers are highlighted in Green, and incorrect answers in Red, along with the rationale.

2 Responses

Leave a Reply

Your email address will not be published. Required fields are marked *