Control Valve – FAT Check List

Control Valve – Factory Acceptance Test (FAT) Checklist Factory Acceptance Test (FAT) Report Control Valve Report ID Project Name Purchase Order (PO) No. Control Valve Tag No. FAT Date Punch List Add Observed Punch Item Non-Conformance Description Suggested Corrective Action Add Item The following items require corrective action before dispatch approval. Item Non-Conformance Description Corrective […]

FAT Check List _ ESD Valve

ESD Valve – Factory Acceptance Test (FAT) Checklist Factory Acceptance Test (FAT) Report Emergency Shutdown (ESD) Valve Report ID Project Name Purchase Order (PO) No. ESD Valve Tag No. FAT Date Punch List Add Observed Punch Item Non-Conformance Description Suggested Corrective Action Add Item The following items require corrective action before dispatch approval. Item Non-Conformance […]

HAZOP work shop work sheet

A Look at the HAZOP Worksheet Format A Hazard and Operability (HAZOP) study is a systematic and structured examination of a planned or existing process or operation, designed to identify and evaluate potential hazards that may represent risks to personnel, equipment, or the environment. At the heart of this critical safety assessment lies the HAZOP […]