Inline Flowmeters such as Magnetic, Coriolis, and Vortex types – FAT Check List

Inline Flowmeter – Factory Acceptance Test (FAT) Checklist Factory Acceptance Test (FAT) Report Inline Flowmeter (Magnetic, Coriolis, Vortex, etc.) Report ID Project Name Purchase Order (PO) No. Flowmeter Tag No. FAT Date Punch List Add Observed Punch Item Non-Conformance Description Suggested Corrective Action Add Item The following items require corrective action before dispatch approval. Item […]

Field Transmitters (PT, DPT, TT) – FAT Check List

Field Transmitter (PT, DPT, TT) – Factory Acceptance Test (FAT) Checklist Factory Acceptance Test (FAT) Report Field Transmitter (PT, DPT, TT) Report ID Project Name Purchase Order (PO) No. Transmitter Tag No. FAT Date Punch List Add Observed Punch Item Non-Conformance Description Suggested Corrective Action Add Item The following items require corrective action before dispatch […]

Control System Cabinets (DCS/IPS/F&G) – FAT check list

DCS/IPS/F&G Cabinet – Factory Acceptance Test (FAT) Checklist Factory Acceptance Test (FAT) Report DCS/IPS/F&G System Cabinets Report ID Project Name Purchase Order (PO) No. Cabinet Tag No. FAT Date Punch List Add Observed Punch Item Non-Conformance Description Suggested Corrective Action Add Item The following items require corrective action before dispatch approval. Item Non-Conformance Description Corrective […]

Control Valve – FAT Check List

Control Valve – Factory Acceptance Test (FAT) Checklist Factory Acceptance Test (FAT) Report Control Valve Report ID Project Name Purchase Order (PO) No. Control Valve Tag No. FAT Date Punch List Add Observed Punch Item Non-Conformance Description Suggested Corrective Action Add Item The following items require corrective action before dispatch approval. Item Non-Conformance Description Corrective […]

FAT Check List _ ESD Valve

ESD Valve – Factory Acceptance Test (FAT) Checklist Factory Acceptance Test (FAT) Report Emergency Shutdown (ESD) Valve Report ID Project Name Purchase Order (PO) No. ESD Valve Tag No. FAT Date Punch List Add Observed Punch Item Non-Conformance Description Suggested Corrective Action Add Item The following items require corrective action before dispatch approval. Item Non-Conformance […]

Vendor Document Review Formats

Pressure Pressure &DP Transmitters Flow Orifice PlateMagnetic FlowmeterVortex flowmeterCoriolis FlowmeterUltrasonic FlowmeterRotameter.xlsxPositive DisplacementThermal mass flowmeter Temperature Temperature ElementsTemperature Transmitter Pressure & Temperature Gauge Level Displacer Level TransmitterGuided Wave Radar Level TransmitterFloat and Tape Level TransmitterUltrasonic Level Transmitter Valves ESD valveControl Valve Control System System Cabinets (DCS/IPS/F&G) Integrated Control and Safety System (ICSS) Analyzers Gas Chromatograph (GC)Analyzer HouseContinuous […]

Instrument Datasheet – Comprehensive I&C Engineering Checklists for EPC Projects

Universal Instrument Datasheet — Final Self-Verification Checklist Universal Instrument Datasheet — Final Self-Verification Checklist Applies to pressure/temperature/flow/level transmitters; control & shutdown valves; basic analyzers. Expand all Collapse all Check all Uncheck all Save Load Reset Print / PDF 0 of 0 checked Header & Document Control Document number & title match project numbering and instrument […]

Technical Bid Evaluation (TBE) – Comprehensive I&C Engineering Checklists for EPC Projects

Technical Bid Evaluation (TBE) — Final Self-Verification Checklist Technical Bid Evaluation (TBE) — Final Self-Verification Checklist Use this before the first formal TBE issue (internal/external). Applicable to instruments (PT/TT/FT/LT), control/SD valves, MOVs, analyzers, panels/JBs, and bulks. Expand all Collapse all Check all Uncheck all Save Load Reset Print / PDF 0 of 0 checked Header […]

Material Requisition (MR) – Comprehensive I&C Engineering Checklists for EPC Projects

Material Requisition (MR) — Final Self-Verification Checklist Material Requisition (MR) — Final Self-Verification Checklist Use this before the first formal review (internal/external). For tagged instruments (PT/TT/FT/LT, control/SD valves, MOVs), panels/JBs, analyzers, and bulk materials (tubing, fittings, glands, cables, accessories). Expand all Collapse all Check all Uncheck all Save Load Reset Print / PDF 0 of […]

Functional Logic Diagrams – Comprehensive I&C Engineering Checklists for EPC Projects

Functional Logic Diagrams — Final Self-Verification Checklist Functional Logic Diagrams — Final Self-Verification Checklist Use this before the first formal review (internal/external). Applies to BPCS/DCS, SIS/IPS/ESD, F&G, package PLCs, MCC interfaces, and inter-unit controls. Expand all Collapse all Check all Uncheck all Save Load Reset Print / PDF 0 of 0 checked Header & Document […]