
Factory Acceptance Test (FAT) Report
DCS/IPS/F&G System Cabinets
Punch List
Add Observed Punch Item
The following items require corrective action before dispatch approval.
Item | Non-Conformance Description | Corrective Action / Remarks |
---|
No open punch list items. All checks passed.
Final Dispatch Report
Dispatch Approved
The DCS/IPS/F&G Cabinet (Tag: DCS-PNL-01A/B) has successfully passed all Factory Acceptance Tests as per the specified procedures and project requirements. All punch list items have been cleared and verified.
The unit is hereby released for packing and dispatch to the end user.
Tagged FAT Check Lists