1
Why is a root valve required at the process take-off?
GeneralPressure
  • Provides primary isolation closest to the process nozzle for safe maintenance.
  • Enables leak testing, line blowing, and instrument removal without depressurizing the equipment.
  • Choose forged needle or OS&Y valve, full-bore for slurry/waxy service; lockable when required.
Install with a short nipple/spool to minimize dead volume and potential plugging.
2
What slope should impulse lines have for self-draining/venting?
GeneralSlope
  • Liquids: Route downward from tap to transmitter with a continuous positive slope to avoid gas pockets.
  • Gases: Route upward from tap to transmitter to avoid liquid traps.
  • Typical minimum slope: ensure a clear gradient (common company specs use ≥ 1:10–1:12 or steeper; some allow ≥ 1:20). Follow your project standard.
Keep runs short and avoid “U” dips. If unavoidable, add vents/drains at local highs/lows.
3
How do I prevent gas pockets in liquid service and liquid pockets in gas service?
General
  • Use correct slope (see Q2) and avoid high/low local traps.
  • Take taps on the side/bottom quadrants for liquid (avoid top unless using dip pipes).
  • Take taps on the top quadrant for gas/vapor service.
  • Provide vent at highs and drain at lows for commissioning and maintenance.
4
What impulse line size and material are typical?
MaterialsGeneral
  • Size (OD): 1/4″ (6 mm) or 3/8″ (10 mm) for short/clean runs; 1/2″ (12–13 mm) for long, viscous, or dirty service.
  • Material: SS316/316L common; consider 6Mo, 825, 625, Monel, or Hastelloy for chloride/H2S sour service per NACE/ISO 15156.
  • Wall thickness: per design pressure & mechanical robustness; match fittings.
5
How long can impulse lines be?
General
  • Keep as short and symmetrical as practical to improve response and reduce plugging risk.
  • As a rule of thumb, try to stay within ≤ 3–5 m; beyond this, consider remote seals/capillaries or relocating the transmitter.
  • For DP, keep HP/LP runs equal length and similar routing/temperature exposure.
6
What about tube supports and routing?
General
  • Support straight runs at ≤ 1.0–1.5 m spacing using cushioned clamps on rigid trays/struts.
  • Avoid sharp bends; respect minimum bend radius (typically ≥ 3–4 × tube OD).
  • Separate from hot lines; shield from foot traffic and impacts; add expansion loops for thermal movement when heat-traced.
7
Which fittings and sealing practices are recommended?
Materials
  • Use double-ferrule compression fittings from one qualified brand per line; avoid mixing.
  • For NPT male threads, apply liquid thread sealant compatible with service; avoid excessive PTFE tape shreds.
  • Torque per vendor; never re-use olives/ferrules after disassembly unless specified.
8
How do I mitigate vibration and pulsation on transmitters?
General
  • Use stiff brackets, short impulse lines, and mount away from vibrating equipment.
  • Install snubbers/restrictors or capillaries; enable transmitter damping (e.g., 0.5–2 s) as process allows.
  • Consider remote seals to eliminate tubing on severe service.
9
When should I use remote seals and capillaries?
GeneralLevel
  • High temperature, viscous/solidifying, polymerizing, or fouling fluids; sanitary/flush requirements.
  • Long distance or inaccessible taps; to remove impulse line plugging risk.
  • Always use equal length capillaries and keep both in the same temperature environment to avoid zero shift.
10
What vent and drain features do I need?
Commissioning
  • Provide vent valves at high points and drains at low points/manifold ports for safe bleeding and zeroing.
  • Use catch bottles to control emissions in hydrocarbon service.
  • Ensure ports are correctly capped/plugged after use to avoid ingress.
11
Where should I locate a pressure tap on a pipe or vessel?
Pressure
  • Liquids: side/bottom quadrant; avoid top to prevent gas accumulation.
  • Gases: top quadrant to avoid liquid carryover.
  • Use weldolet/sockolet or flanged tap with minimum intrusion; follow thickness & reinforcement rules.
12
What is the correct mounting orientation for a pressure transmitter?
Pressure
  • Mount with process connection down for liquids; up for gases (to align with drainage/venting).
  • Keep electronics housing horizontal to protect cable entries from water ingress; use drip loop.
  • After mounting, perform a position zero if the vendor recommends it.
13
How do I bleed and zero a pressure transmitter after installation?
Commissioning
  • Close root valve; open drain at manifold to depressurize; connect a safe vent/collection.
  • Crack open root slowly to purge air; close when solid stream appears; tighten, then zero on the transmitter/HART/FF.
  • Leak test and restore to service per procedure.
14
Do I need a block & bleed manifold for a single pressure tap?
PressureMaterials
  • Yes—use a 2-valve block & bleed (isolation + bleed) or integral valve assembly to permit removal and calibration.
  • In hazardous service, choose fire-safe rated valves and metal-to-metal seats where required.
15
How do I protect a pressure transmitter from overpressure?
Pressure
  • Use built-in transmitter overrange protection if available; otherwise consider pressure limiting valves or snubbers.
  • Never expose the instrument to system hydrotest pressure without isolation/blinding.
16
What corrosion factors must I check for impulse tubing?
Materials
  • Chloride stress corrosion cracking, H2S sour service (NACE/ISO 15156 compliance), CO2 corrosion, erosion by sand.
  • Galvanic couples (mixing alloys), under-insulation corrosion where heat-traced/insulated.
17
How should I leak-test a new pressure impulse line?
Commissioning
  • Use inert gas (e.g., N2) or clean service fluid per procedure; pressurize to test level; soap/bubble test all joints.
  • Record torque witness marks; verify no pressure decay; then blow down safely.
18
How do I prevent freezing or waxing in impulse lines?
Steam/Heat-tracePressure
  • Apply steam/electric heat tracing and insulation; include expansion loops and avoid overheating the transmitter.
  • Select suitable fill fluid (for remote seals/wet legs) with proper pour/boiling points.
  • Consider purge systems for sticky service where allowed.
19
Any special considerations for small-bore taps on high-pressure lines?
Pressure
  • Use reinforced connections/nozzles; check piping code for minimum thickness and reinforcement pad requirements.
  • Install blow-out proof valves; ensure orientation eliminates direct jet impingement on tube.
20
What documentation should accompany a pressure installation?
Commissioning
  • Updated P&IDs, hook-ups, isometric sketches, loop diagrams, set ranges, calibration sheets, hydrotest/leak test records.
  • Material certificates for wetted parts when required (e.g., NACE).
21
Where do I take DP taps for primary flow elements?
FlowDP
  • Orifice plate: corner/flange taps or vena-contracta per standard; keep both taps at the same elevation.
  • Venturi/V-cone/Annubar: follow vendor standard locations and orientations.
  • Maintain straight-run requirements upstream/downstream as per the element standard.
22
Why must HP and LP impulse lines be equal?
DP
  • Equal lengths and similar routing/temperature reduce zero shift and dynamic lag mismatch.
  • Support and slope both lines identically.
23
How do I use a 3-valve/5-valve manifold for DP?
CommissioningDP
  • Isolation: HP & LP blocks; Equalize: center valve; 5-valve: adds vent/drain valves.
  • Zeroing sequence: Close HP & LP blocks → Open equalize → Vent any trapped gas via vent port → Zero transmitter → Close equalize → Open HP & LP blocks slowly.
24
What about zero elevation/suppression with DP flow?
DP
  • Keep taps at the same elevation to avoid hydrostatic head errors.
  • If unavoidable, calculate and configure elevation/suppression; document in loop sheets.
25
How do I handle steam flow DP measurements?
SteamFlow
  • Use condensate pots at the same elevation on both HP/LP with wet legs to protect the transmitter.
  • Insulate/trace as needed; pre-fill legs with clean condensate to a marked level before commissioning.
26
How do I avoid impulse line plugging with dirty fluids?
Flow
  • Use side tappings (e.g., 45°) instead of bottom; increase tube size; minimize dead legs.
  • Add flush rings or purge connections; consider remote seals with larger flush ports.
27
Tap orientation for gas vs liquid vs two-phase in flow lines?
  • Gas: top taps; slope up to transmitter.
  • Liquid: side/bottom taps; slope down to transmitter.
  • Two-phase: avoid if possible; otherwise select location with most stable phase and use separators/legs.
28
How should I purge/flush DP lines before startup?
  • Isolate transmitter; open root to low-hazard purge medium compatible with process; flush until clean.
  • Use rotameter/regulator on purge; avoid over-pressurizing the transmitter; dispose effluent safely.
29
Where should square-root extraction be applied?
  • Either in the transmitter or control system—but not both.
  • Document the configuration; ensure ranges/engineering units and density/compensation are consistent.
30
What is the impact of elbows/tees close to the flow element taps?
  • Nearby fittings distort the pressure field and can bias DP; respect straight-run and tapping distance rules in the element standard.
  • If constraints exist, use flow conditioners or alternative elements less sensitive to profile.
31
How do dynamic lags in HP/LP lines affect DP response?
  • Mismatched volumes/lengths cause phase lag and overshoot; keep lines symmetrical and minimize trapped volumes.
  • Increase transmitter damping only as needed to reject noise without masking real dynamics.
32
Should I insulate or heat-trace DP lines used for gas flow with possible condensation?
  • Yes—prevent condensation in gas DP lines in cold spots; otherwise use water pots/separators with controlled drains.
33
How is DP level arranged on an open tank?
Level
  • HP connected to bottom nozzle; LP vented to atmosphere.
  • Route HP downwards; keep LP line short and protected from rain/dust; add weatherhood.
34
What is a wet leg and when is it used?
  • Wet leg: LP side intentionally filled with a stable seal fluid to a known height.
  • Used for closed tanks with vapor (e.g., steam, hydrocarbons) to protect LP side and stabilize DP.
  • Choose fill fluid compatible with process temperature & density; maintain reference height in documentation.
35
How do I calculate LRV/URV for DP level with wet leg?
  • LRV/URV depend on liquid SG, seal fluid SG, and elevation distances.
  • Compute static heads (ρgh) for HP and LP; apply suppression/elevation as needed; verify sign convention.
  • Record the exact reference heights used in the hook-up for future maintenance.
36
When should I select remote seals for level?
  • For viscous/sticky/slurry service, extreme temperatures, or when impulse lines would be very long or clogging.
  • Use equal capillary lengths, same routing and sun exposure; select diaphragm/flange materials for corrosion.
37
How do condensate pots apply to DP level in hot vapor service?
  • Install pots at the same elevation on HP and LP to keep equal wet legs; tolerance typically a few millimetres.
  • Insulate and mark the reference line; fill both legs to the same level before zeroing.
38
How do temperature changes affect capillary-sealed level measurements?
  • Differential heating of capillaries changes fill-fluid density/volumetric expansion, shifting zero.
  • Route both capillaries together; shield equally; avoid one in sun, one in shade; use temperature-stable fill fluids.
39
Do I need density compensation for DP level?
  • If process SG varies significantly with temperature/composition, enable temperature or density compensation in the DCS or transmitter.
  • Otherwise, measurement error will scale with SG change.
40
What accessory piping helps stabilize level measurements?
  • Stilling wells or bridles to reduce turbulence/foam effects.
  • Use isolation + drain + vent on the bridle for maintenance.
41
Can DP measure interface level?
  • Yes, where two liquids have a sufficient SG difference; calibrate for expected SGs and maintain a steady upper phase.
  • Beware emulsion layers; consider guided wave radar or displacer if interfaces are unstable.
42
How do I deal with foam/boiling in DP level taps?
  • Use bridles/stilling wells; place HP tap where foam is minimal.
  • Slow damping; ensure no gas carry-under into HP leg; consider alternative technology if severe.
43
What is the recommended sequence to commission a new transmitter with impulse lines?
  • Verify hook-up vs. P&ID → Mechanical checks (supports, slope, fittings) → Leak test → Line flushing/purging → Zeroing (manifold equalized) → Range/config checks → Functional test with process → Hand over with records.
44
How do I pressure test without damaging the transmitter?
  • Install blinds or disconnect at manifold; test up to piping test pressure on the process side only.
  • Keep transmitter isolated; never exceed its max working pressure rating.
45
What identification and tagging should be present?
  • Instrument tag plate, flow direction arrows (for DP flow), root valve tags, manifold identification, and tubing labels (HP/LP).
  • Mark reference elevation lines for wet legs/condensate pots.
46
Any special notes for heat tracing and insulation?
  • Trace only as needed; avoid tracing across valve stems/manifold bodies.
  • Use removable insulation boxes around manifolds to permit access and prevent under-insulation corrosion.
47
What safety steps precede maintenance on an instrument impulse line?
  • Follow LOTO; isolate at root; depressurize and drain; gas test if required.
  • Use appropriate PPE; control emissions; verify zero energy before loosening fittings.
48
What common installation mistakes should I avoid?
  • No slope or inverted traps; mixed fitting brands; long unsupported spans; unequal HP/LP routing; missing vents/drains; double square-rooting.
49
Best practices for cleanliness before hook-up?
  • Cap all open ends; blow lines with clean medium; strainers on purge lines; keep ferrules and seats free from grit; wipe threads of sealant debris.
50
Quick troubleshooting: erratic or biased readings — what to check?
  • Erratic/noisy: air/gas in liquid legs, liquid in gas legs, vibration, pulsation, inadequate damping.
  • Offset/zero shift: unequal line lengths, temperature imbalance on capillaries, wrong elevation/suppression, wet leg level changed.
  • Slow response: long narrow tubing, plugged taps, partially closed valves, debris in restrictors.