Bow-Tie Analysis Worksheet: Oil & Gas Operations
Date: [Date of Workshop]
Facility/Unit: [e.g., LNG Train 2, Crude Distillation Unit]
Team Members: [List of Participants and Roles]
Scenario Scribe: [Name]
1. Hazard Identification
Hazard: A source of potential harm or a situation with the potential for causing loss.
-
Description:
[e.g., High-pressure flammable gas, Stored hydrocarbon liquid, Sour gas (H₂S)]
2. Top Event
Top Event: The point where control over the hazard is lost. This is the central knot of the bow-tie.
-
Description:
[e.g., Loss of containment from a pipeline, Uncontrolled release of hydrocarbons, Vessel overpressure]
3. Bow-Tie Diagram Components
Left Side: Prevention
This side details the Threats that could cause the Top Event and the Preventive Barriers in place to stop them.
Threat (Cause) | Preventive Barrier (Control) | Barrier Type (e.g., Eng, Admin, PPE) | Barrier Effectiveness (High/Med/Low) & Notes | Owner (Dept/Role) | Action Item? (Y/N) |
e.g., External corrosion | e.g., Pipeline coating & cathodic protection | Eng | High: Inspected annually per schedule. | Integrity Dept. | N |
e.g., Operator error (wrong valve opened) | e.g., Clear operating procedures & training | Admin | Med: Procedure exists, refresher training due. | Operations | Y |
[Enter Threat] |
[Enter Barrier] |
[Select Type] |
[Assess & Justify] |
[Enter Owner] |
[Y/N] |
[Enter Threat] |
[Enter Barrier] |
[Select Type] |
[Assess & Justify] |
[Enter Owner] |
[Y/N] |
Right Side: Mitigation & Recovery
This side details the potential Consequences of the Top Event and the Mitigative/Recovery Barriers in place to reduce their impact.
Consequence (Outcome) | Mitigative/Recovery Barrier | Barrier Type (e.g., Eng, Admin, PPE) | Barrier Effectiveness (High/Med/Low) & Notes | Owner (Dept/Role) | Action Item? (Y/N) |
e.g., Gas cloud ignition (fire/explosion) | e.g., Gas detectors & automated ESD | Eng | High: Tested quarterly, full proof test last year. | Instrument Dept. | N |
e.g., Injury to personnel | e.g., Emergency response plan & site drills | Admin | Med: Plan is clear, last drill had communication gaps. | HSE/ER Team | Y |
[Enter Consequence] |
[Enter Barrier] |
[Select Type] |
[Assess & Justify] |
[Enter Owner] |
[Y/N] |
[Enter Consequence] |
[Enter Barrier] |
[Select Type] |
[Assess & Justify] |
[Enter Owner] |
[Y/N] |
4. Escalation Factors & Controls
This section addresses conditions that could cause a barrier to fail (Escalation Factors) and the controls for those conditions.
Barrier Being Challenged | Escalation Factor (Why the barrier might fail) | Escalation Factor Control (How we manage it) | Owner (Dept/Role) | Action Item? (Y/N) |
e.g., Gas detectors & automated ESD | e.g., Inadequate maintenance/calibration | e.g., Preventive Maintenance (PM) program in CMMS | Maintenance | N |
e.g., Clear operating procedures & training | e.g., Outdated procedures not reflecting plant changes | e.g., Management of Change (MOC) process | Technical/Eng. | N |
[Link to Barrier] |
[Enter Factor] |
[Enter Control] |
[Enter Owner] |
[Y/N] |
[Link to Barrier] |
[Enter Factor] |
[Enter Control] |
[Enter Owner] |
[Y/N] |
5. Workshop Summary & Action Plan
Key Findings:
-
[Summarize the most significant risks or weakest barriers identified.]
-
[Note any systemic issues that appeared multiple times.]
This log is designed to clearly track tasks identified during the Bow-tie workshop, ensuring accountability and progress.
Action Items Log
Action ID | Action Description | Priority (H/M/L) | Responsible Person / Dept. | Due Date | Status (Open, In Progress, Completed, Overdue) | Notes / Verification Method |
BT-01 | Revise Operating Procedure SO-P-1134 for compressor startup to include new interlock checks. | H | Operations Lead | 30-Sep-2025 | Open | Procedure updated in document control system and communicated to all shifts. |
BT-02 | Schedule and conduct refresher training for all control room operators on the updated procedure SO-P-1134. | H | Training Coordinator | 31-Oct-2025 | Open | Training records signed and filed for all relevant personnel. |
BT-03 | Inspect and verify the tagging for all critical isolation valves in Unit 15 as per P&ID-15-002 Rev C. | M | Maintenance Supervisor | 15-Nov-2025 | Open | Completed inspection sheet submitted to Plant Integrity Engineer. |
BT-04 | Review the last Emergency Response Drill report (Drill-2025-01) and develop a plan to address communication gaps. | H | HSE Manager | 15-Oct-2025 | In Progress | Action plan to be presented at next month’s Safety Committee meeting. |
BT-05 | Evaluate the alarm flood scenario for the main control panel and propose an alarm rationalization plan. | M | Instrument & Control Engineer | 31-Dec-2025 | Open | Report with recommendations to be issued for management review. |