Manpower Planning & Allocation Tool 📊 Manpower Planning & Allocation A dashboard to manage engineers, projects, and monthly workload. 👨💻 Engineer Management Engineer Name Hours/Month Add Engineer List Name Hours/Month Action 🏗️ Project Management + Add New Project Project Name Duration Hours Action 📅 Monthly Loading Chart Export CSVExport PDF...
Advanced Instrumentation I/O Calculator Advanced I/O Calculator Calculate I/O with DCS/IPS/F&G system breakdown. I/O Configuration Instrument Type System Qty Analog In (AI) Analog Out (AO) Digital In (DI) Digital Out (DO) Actions IS Non-IS IS Non-IS IS Non-IS IS Non-IS Add Custom Instrument Instrument Name System DCSIPSF&G Qty AI (IS)...
Control Valve Sizing ISA-75.01.01 (IEC 60534-2-1) 1. Global Settings Units Metric (kPa, m³/h, kg/h, °C)Imperial (psi, gpm, lb/h, °F) Fluid State LiquidGas / Vapour Atmospheric Pressure (kPa abs) Valve Characteristic LinearEqual PercentageQuick Opening Rangeability (R) 2. Fluid Properties Specific Gravity (Gf) Vapor Pressure (kPa abs) Viscosity (cP) Molecular Weight (M)...
Interactive SPA: EPC Guide to Orifice Plate Sizing Review 5-Step EPC Guide to Orifice Plate Sizing Review An interactive guide to ensure flow measurement accuracy and prevent costly errors by mastering the review of vendor calculations. 1 Gather Essential Documents Before starting, ensure you have all critical documents. The review...
Mastering the Flow: A Comprehensive Guide for Instrument Engineer on Reviewing Orifice Plate Sizing Calculations In the intricate world of Engineering, Procurement, and Construction (EPC) for industrial plants, precision is not just a goal; it’s a fundamental requirement. From chemical reactors to hydrocarbon pipelines, the ability to accurately measure and...
The Ultimate Guide to Functional Design Specification for Continuous Emission Monitoring Systems (CEMS) In the landscape of modern industry, the imperative to operate sustainably and responsibly has never been more pronounced. At the heart of this responsibility lies the precise measurement and control of industrial emissions. For facilities that release...
For Engineering, Procurement, and Construction (EPC) contractors, the meticulous review of an Original Equipment Manufacturer’s (OEM) anti-surge control valve design is a critical step in safeguarding the integrity and operational stability of a centrifugal compressor. A failure in this single piece of equipment can lead to catastrophic compressor damage, resulting...
Control Valve GA Drawing Checklist Control Valve General Arrangement (GA) Drawing Review Checklist 1. General Information & Document Control 1. Correct Project Name and Number 2. Correct Purchase Order (PO) Number 3. Correct Valve Tag Number(s) 4. Correct P&ID Number Referenced 5. Correct Line Number Referenced 6. Correct Instrument Data...
P&ID Instrumentation Review Checklist P&ID Instrumentation Review Checklist A comprehensive guide for Instrument Engineers in the Oil & Gas Industry. 1. General & Document Control Is the P&ID number and title correct as per the document list? Is the revision number and date consistent with the project stage? Are all...